Non-staging method - List of Manufacturers, Suppliers, Companies and Products

Non-staging method Product List

1~1 item / All 1 items

Displayed results

Non-staging method

We will overcome the constraints related to the construction space and build a continuous wall of driven piles using a no-temporary-works method!

The "Non-Staging Method" is a construction method that uses the "GRB System," where all construction machinery involved in the pressing process advances along the top of the completed pile as a working path. This method eliminates unnecessary temporary construction in construction projects, allowing for a rational execution of the primary objective, which is the wall construction work, through "temporary-less construction." The construction system is lightweight and compact, making it possible to reduce construction time and costs without obstructing the flow cross-section or current traffic, even in waterway renovation work in densely populated residential areas, railway proximity work, and widening work on heavily trafficked main roads. 【Features】 ■ Achieves temporary-less construction ■ Enables construction under severe conditions that are difficult with conventional methods ■ Realizes environmentally conscious construction ■ Ensures high safety with no risk of tipping over ■ Simultaneously achieves consideration for the environment and reduction of costs and construction time under various site conditions *For more details, please refer to the PDF document or feel free to contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration